Energy where it is most useful

How ProSeed uses precisely controlled microwave processing for industrial drying and thermal treatment

In one pharmaceutical trial, a drying step that took five days under vacuum was reduced to approximately 30 minutes. ProSeed develops microwave processing designed around the properties of each material. On 1 December, the team brings its work to CAPTURE by Energypolis in Sion.

“ProSeed replaces slow, energy-intensive thermal treatment with precisely controlled microwave processing, designed around the properties of your material, so that energy is delivered where it is most useful,” says Aurélien, Co-Founder of ProSeed. The result, in his words: drying or treating the product faster, preserving quality, and opening the door to continuous industrial production, rather than relying on large volumes of heated air.

Energy where it is most useful

Microwave energy interacts with a material according to its dielectric properties. This allows ProSeed to concentrate the treatment on moisture or residual solvents, rather than heating large volumes of air and the entire product unnecessarily. It matters most when removing the final percentage points of moisture.

In its pilot work, ProSeed measured around 0.67 kWh per litre of evaporated water, compared with a representative conventional benchmark of about 1.2 kWh per litre: approximately 44% lower specific energy consumption in this comparison. Actual savings depend on the material and the industrial process.

CO₂, calculated case by case

The process is electrically powered, so it can remove the direct fuel combustion associated with the drying step. The total CO₂ reduction depends on the electricity mix, the existing gas use and the energy consumption of the new process. “Rather than claiming one universal percentage, we calculate the energy and emissions balance for each customer application,” the founder explains. Water vapour and, where relevant, solvent vapours still need to be managed safely.

A 150 kW pilot in Martigny

ProSeed’s most advanced technology platform is its 150 kW continuous industrial pilot in Martigny, where more than 30 different materials have been tested. The company is developing applications in three areas:

  • Pharmaceuticals: in one residual solvent removal trial, a drying step went from five days under vacuum to approximately 30 minutes.
  • Minerals: precise final drying, including calcium carbonate.
  • Food: controlled thermal treatment and extraction.

A typical project moves from paid feasibility testing to process design and, ultimately, installation at the customer’s site.

From the sample to the production line

Each project starts by characterising the actual material and its dielectric behaviour, then developing and validating the treatment with small samples. Electromagnetic and thermal simulations guide the design of the chamber and the process settings. The approach is then tested on the 150 kW pilot, before ProSeed engineers a modular unit for the customer.

Feasibility work can be completed in weeks. Engineering, manufacturing and commissioning an industrial installation normally take several months, depending on the product, the process requirements, site integration and any qualification needs.

Energy where it is most useful

A more uniform and reproducible treatment

The concern ProSeed hears is that microwaves create hot spots and cannot deliver the uniformity industrial processes require. “Anyone who has reheated a meal in a microwave knows the problem: some parts are hot while others remain cold. That is precisely the challenge ProSeed addresses,” says Aurélien. “We combine material characterisation, electromagnetic and thermal modelling, tailored chamber design and process monitoring to make treatment more uniform and reproducible. We then validate performance with the customer on real materials, measuring product quality, throughput and energy use before proposing a production installation.”

What you’ll see at their stand

On 1 December, visitors will meet the ProSeed team and learn about its continuous industrial microwave pilot, with photos and examples of the processes and materials tested. The team will show how a carefully engineered microwave process can be applied to pharmaceutical powders, minerals and food ingredients, and discuss what it takes to move from technical feasibility to industrial integration.

The question to ask them: “Where is drying or thermal treatment limiting your production capacity, and what would change if that step were dramatically faster?”

Who ProSeed wants to meet in Sion

  • Production and R&D teams in pharmaceuticals, minerals and food facing slow drying, difficult residual solvent removal, precise final moisture specifications or other thermal treatment bottlenecks
  • Engineering firms and equipment manufacturers looking to integrate controlled microwave processing into industrial lines
  • Partners willing to explore an on-site pilot
  • Investors who understand industrial deep tech and want to support ProSeed’s seed round, as it moves from validated pilot technology to customer deployments

Want to meet the ProSeed team? Come and see them at CAPTURE by Energypolis, on 1 December 2026 at the Halle Industrielle Provins in Sion. Get a 40% discount code using DRY40 at check-out

Programme and registration: https://capture.energypolis.ch/

Energy where it is most useful
Cookie policy
By continuing to browse this site, you agree to the use of cookies to improve your user experience and for the generation of visit statistics. You can customise the use of cookies using the buttons below.
My preferences